TapCub is live — analytics, insights and live chat, free on one platform
Product News

Phased Rollout: How to Release in Stages and Measure Each Step

How to run a phased rollout with measurable gates: the Apple and Google Play schedules, what each step can actually detect at a given user count, a five-step plan with go and stop rules, and what to do when a gate fails.

Lin Zhou Published Nov 22, 2026 11 min read Product News
Sample data: relative error of a count n is about 1.96 ÷ √n. The 1% step detects a doubling of the crash rate (32 against 16) but not a 25% rise (20 against 16).Sample data

A phased rollout releases a change to a growing share of users in planned steps and moves on only when a measured gate is met. Apple's automatic schedule runs 1%, 2%, 5%, 10%, 20%, 50%, 100% over seven days, and Google Play lets you pick the steps. Early steps are small, so they catch only big problems: at 1% of 200,000 users you expect 16 crashing users, which detects a doubling but not a 25% rise. Below: schedules, a gated plan and the failure routine.

What you will learn

  • Write go and stop rules with numbers before the release, and name one owner for the decision
  • The 1% step has few users: 16 expected crashing users in the sample, enough to catch a doubling but not a 25% rise
  • Include a business metric such as purchase conversion as a gate; a release can be stable and still break checkout

What is a phased rollout?

A phased rollout releases a change to a growing share of users in planned steps, and moves to the next step only when a measured condition is met. The point is to limit the damage of a bad release: if something is wrong at 1% of users, 99% never see it. A phased rollout differs from a plain gradual release in one way, the gate: each step has a number that must be met before the share grows.

This guide is about the measurement side. For the delivery family it belongs to, see progressive delivery; for the metrics that act as gates, see guardrail metrics. Below: how the app stores handle phases, how much each step can actually tell you, a schedule with gates you can adapt, and what to do when a gate fails.

How do the app stores run a phased release?

The two big app stores work differently, and the difference matters for planning.

Apple (phased release for automatic updates)Google Play (staged rollout)
StepsFixed 7-day schedule: 1%, 2%, 5%, 10%, 20%, 50%, 100% on days 1 to 7You choose the percentage and raise it yourself
Who gets it firstA random sample of users with automatic updates on eligible devicesA random percentage of users
Manual downloadsAnyone can still get the update from the App Store at any timeNot stated on the help page
PausingUp to 30 days in total, with no limit on the number of pausesHalting stops new users from receiving the version; those who have it keep it
Moving fasterRelease to all users at any timeRaise the percentage in Manage rollout
What the store tells youThe schedulePercentage will not increase automatically; monitor crash reports and feedback closely

Apple's 30 days is a budget, not a per-pause limit: if you pause for 10 days and resume, 20 days of pause time remain. The rollout resumes on the day it left off. On Google Play the percentage never rises by itself, so the person who raises it is the gate; make sure that person is looking at a number, not at a calendar.

Neither store applies to a web release or to a server change. For those you need your own mechanism, such as a traffic split or a feature flag, and the same gates apply to it.

Apple phased releaseGoogle Play staged rollout
StepsFixed 7 days: 1, 2, 5, 10, 20, 50, 100%You choose and raise the percentage
PausingUp to 30 days in totalHalt stops new users; current users keep it
Moving fasterRelease to all users at any timeRaise the percentage in Manage rollout
Percentage rises by itselfYes, on the scheduleNo

Neither store covers web or server releases; use a traffic split or flag tool for those.

How much can you learn at each step?

A small step has little data, and that limits what it can detect. Sample data: an app with 200,000 daily active users and a baseline crash rate of 0.8% (crashing users ÷ active users). Using Apple's schedule shares for illustration:

StepShareUsersExpected crashing users at baselineRelative error of that count
Day 11%2,00016±49%
Day 22%4,00032±35%
Day 35%10,00080±22%
Day 410%20,000160±15%
Day 520%40,000320±11%
Day 650%100,000800±7%
Day 7100%200,0001,600±5%

The recomputation: users are 200,000 × share, expected crashing users are users × 0.8% (2,000 × 0.008 = 16), and the relative error of a count n is roughly 1.96 ÷ √n, so 1.96 ÷ √16 = 49%.

Two conclusions. First, the 1% step catches only big problems. If the new version doubles the crash rate, you expect about 32 crashing users against 16 at baseline; under a Poisson model with a standard deviation of 4, that is (32 − 16) ÷ 4 = 4 standard deviations, clearly visible. A 25% rise gives 20 against 16, only 1 standard deviation, indistinguishable from noise. The early steps are insurance against disasters, not a way to measure small effects. Second, if you see no crashes at all, the sample still limits your certainty. With zero events in n trials, the upper 95% bound on the rate is about 3 ÷ n (the rule of three), so zero crashing users among 2,000 means the true rate could still be as high as 3 ÷ 2,000 = 0.15%; among 10,000 it is 0.03%.

app.tapcub.com

Relative error of the crash count by step

sample data, 200,000 users, 0.8% baseline
1% step (16 crashing users)±49%
5% step (80)±22%
20% step (320)±11%
100% (1,600)±5%
Sample data
Sample data: relative error of a count n is about 1.96 ÷ √n. The 1% step detects a doubling of the crash rate (32 against 16) but not a 25% rise (20 against 16).

What does a schedule with gates look like?

Sample data: a schedule for the app above. Each gate has a go rule and a stop rule, written before the release so nobody argues about them afterwards.

StepShareMinimum timeMinimum evidenceGo ifStop if
11%24 hours2,000 usersCrash rate ≤ 1.6% (twice baseline) and no new crash group above 10 usersCrash rate > 1.6% or any crash on the purchase screen
25%24 hours10,000 usersCrash rate ≤ baseline + 0.3 points (1.1%)Above 1.1% for 2 checks
320%48 hours40,000 usersCrash rate ≤ 1.1%; purchase conversion within 5% of the old versionConversion more than 10% below the old version
450%48 hours100,000 usersAll gates holdAny gate fails
5100%Release to all

The crash gates can also be anchored to Google's Android vitals thresholds, which define bad behaviour as at least 1.09% of daily users experiencing a user-perceived crash across all device models, or at least 8% for a single device model; for ANRs the figures are 0.47% overall and 8% per device model. A release that crosses these lines on Android risks being treated as bad behaviour by the store, so set your stop rule below them, as the table does.

Three habits make gates work:

  • Compare against the old version on the same days. A holiday weekend changes behaviour for everyone; the old version is your control.
  • Name one owner for the decision. On a stop, they decide halt, fix or continue; no meeting needed.
  • Include one business metric. A release can be stable and still break checkout. Add purchase or activation conversion as a gate next to crashes.

What do I do when a gate fails?

  1. Pause or halt first, diagnose second. On Apple, pause the phased release (up to 30 days in total); on Google Play, halt the rollout so no more users receive it. Users who already have the version stay on it.
  2. Find the group. Look at which version, device model and screen the failures concentrate on. A failure that appears on one device model at 8% is a different problem from a 1% crash across all.
  3. Decide: fix forward or revert. If the cause is clear and small, ship a fixed build; if not, stop the rollout and keep the old version as the main release.
  4. Reset the schedule. A new build restarts at step 1, not where you stopped, because the evidence belongs to the old build.
  5. Record the failure. Write down the gate that caught it and how long it took to notice; use it to tighten the next schedule. Also note who made the decision and when, so that a later review can separate the rule from the judgment call, and check whether the stop rule fired as early as it should have.

How do I watch a rollout in TapCub?

TapCub measures how each step performs. It does not set the rollout percentage, split traffic or run feature flags; the percentage is set in the app store console or in your flag tool.

  1. Mark each step. Add a date annotation for each step in Configuration › Annotations (for example "v5.2 at 5%") so every chart shows when the share changed.
  2. Check adoption. App analytics › Users › Versions lists each version with its share of active users, crash count and first-seen date, so you can compare the real share with the planned one. A stage that is meant to be 5% but shows 1% has not reached users yet.
  3. Read stability. App analytics › Quality & attribution › Stability shows the crash-free share (1 − crashing users ÷ active users), crashes, ANRs and error groups; filter groups by active, resolved or ignored. Check in the SDK documentation that your platform reports crashes automatically, because not every SDK does.
  4. Alert on the gate. In All-platform analytics › Operations › Monitors, create a monitor on error rate or errors with an hourly check and a test run that tells you how many times it would have fired in the past 30 days. It only notifies; it does not halt anything.
  5. Compare a business metric. Build the purchase or activation funnel in All-platform analytics › Behavior › Behavior analysis, and compare the new version with the old one.
  6. For web releases, Monitoring › Errors groups errors by occurrences, sessions and last seen, with active, resolved and ignored states.

FAQ

What is a phased rollout?

A release to a growing share of users in planned steps, moving on only when a measured condition is met. The first step is small so that a bad release harms few users. It is the same idea as a staged rollout, with explicit gates between steps.

What percentages should a phased rollout use?

Apple's automatic phased release uses 1%, 2%, 5%, 10%, 20%, 50% and 100% over seven days. On Google Play you choose your own. A schedule such as 1%, 5%, 20%, 50%, 100% works well, with a minimum time and sample at each step.

How long should each phase last?

Long enough to collect the sample your gate needs and cover a normal daily cycle: at least 24 hours for the early steps. Time alone is not a gate. In the sample here, a 1% step has 2,000 users and only 16 expected crashes, so it can catch only large problems.

How do I know if a phased rollout is going wrong?

Compare crash rate, errors and one business metric against the old version over the same days, using rules written beforehand. Google's Android vitals treats 1.09% of daily users with a user-perceived crash as bad behaviour across all devices. Set your stop rule below it.

Can I pause a phased rollout?

On Apple, yes, for up to 30 days in total with no limit on the number of pauses, and it resumes on the day it left off. On Google Play you can halt the rollout, which stops new users from getting the version while those who have it keep it.

Sources

Filed underProduct News

Was this article helpful?

We use your answers to fix and expand this page.

Lin Zhou

Product Experience Specialist

Writes about product experience, practical workflows, and growth, turning complex processes into clear steps for everyday decisions.

Watch each step in your app data

Share of active users by version, crash-free share and error groups, date annotations and monitors on error rate.

See your data clearly. Find your growth.

Every click, backed by data. Install one line of code and see your first numbers in a minute.

No credit card · Free plans for analytics and chat · Cookieless analytics